Get my bath price
Wood double vanity with open shelves and woven baskets, a framed mirror, and a frameless glass shower with marble walls beside it

Showers

Shower remodeling in West Chester, Ohio

A tiled shower with the waterproof layers done right where you cannot see them.

Large marble bathroom with a dark double vanity and white quartz top, a marble clad corner tub under two windows, a glass walk in shower and a lantern pendant
Under the tile

A membrane on the walls and a pan pitched toward the drain stop water reaching the studs. Tile by itself lets water through.

Glass comes last

The frameless panels get measured off finished tile, so they show up roughly a week after the tiler leaves.

  1. 01Niche

    A tiled cubby for shampoo, framed on an interior wall before the backer board goes on.

  2. 02Bench

    Built in or floating, with blocking set in the wall before any tile.

  3. 03Valve

    A pressure balancing valve stops the scalding jump when a toilet flushes.

In the price tool

Cost it out, then spin the room

  1. 01
    A price you can read line by line

    Plumber, tile setter, vanity, glass and permit, every one costed from Cincinnati area pay rates.

  2. 02
    Start from your kind of bathroom

    Primary bath, hall bath with a tub, walk in shower or powder room. Choose the one that looks like yours.

  3. 03
    Finish it in 3D

    Set the vanity color, the wall tile and the faucet finish, then spin the whole room to look at it.

Showers

Showers: common questions

01How long does a new shower take?

Figure 1 to 2 weeks on site, plus about a week waiting on glass.

02Does the drain have to move?

No. Leaving it put saves money. Relocating it means cutting the floor open.

03Will a new shower need a permit?

When pipes move or new lines run, yes, and the contractor files for it.

No house call needed

Price it with your own choices

Vanity, tile, glass and fixtures. Each choice changes the total.